
The Challenge
At Rio Tinto’s Brockman 2 mine site, with the expanding fleet of equipment, the number of workshop bays also needed expanding.
Our Approach
Standing over 11m in height, this High-Rise design allowed for more flexibility underneath when servicing equipment. Using the DomeShelter™ brand, Rio Tinto was able to customize the design to include a 6m supported span between the two workshops, as well as having the ‘peace of mind’ of a proven, intelligently engineered solution!